
Every bathroom job starts the same way — with everything coming out. Old tiles off, walls stripped back, floor lifted, and pipework exposed so we can see exactly what we're working with. It never looks pretty at this stage, but this is where the quality of the finish is decided.

Day one — tiles off, walls stripped, and pipework exposed.
Then the rebuild begins
Fresh boarding and plastering, re-routed pipework, new flooring, full re-tile, and every fitting installed properly and tested. No shortcuts hidden behind the tiles — because the parts you can't see are the parts that cause problems years down the line.



Thinking about yours?
If your bathroom is tired, dated, or just not working for your family anymore — we do the whole thing. Plumbing, tiling, electrics, and finishing, all by one trusted local team. No juggling different trades, no half-finished rooms.
Get in touch for a free, no-obligation quote and we'll talk through what's possible in your space.
